PRF Reports (Pollutant Reduction Facility)
Project Completion Reports Pollutant Reduction Facilities (PRF)
Shoreline PRF Design Approach at Cherry Creek Reservoir
Special Study No. 2 Final Report: Phosphorus Removal Effectiveness of PRFs
Effects of September 2013 Flood Event on PRF’s in the Cherry Creek Basin
West Shade Shelter Shoreline Stabilization PRF – Water Quality Analysis
Shop Creek Wetlands Polutant Reduction Facility Wetland Assessment
Planning Documents
2010 Weed Management Plan for the Basin Authority
2011 Weed Management Plan Report
CCB Water Quality Management Master Plan
Hydros CCR Model Tasks 3-3A Attachments Draft 7-31-15
Hydros CCR Model Tasts 3-3A Draft Memo 7-31-15
Management of Onsite Wastewater Systems (OWS)
Feasibility Evaluation for Cherry Creek State Park Wetlands Project
Feasibility Report Cherry Creek Reservoir Destractification
Feasibility Study for the Cherry Creek Basin Drainageway
Alternative Analysis Cherry Creek Reservoir West Boat Ramp Parking Lot Water Quality Improvements
CH2MHill – Nonpoint Source Evaluation
Cherry Creek State Park – Lake Loop Study Area
Stream Reclamation Projects
Cherry Creek @ Shop Creek Final Stream Reclamation Plan
Cherry Creek 12-Mile Park DRAFT Alternatives Evaluation Report
Cherry Creek 12-Mile Park DRAFT FINAL Site Assessment Report
Cherry Creek 12-Mile Park Proposal: Reclaiming the Stream while Enriching the Dog Park Experience
Cherry Creek 12-Mile Park Stream Reclamation – Channel Sedimentation
Cherry Creek 12-Mile Park Stream Reclamation – Water Quality Benefits and Costs
Cherry Creek 12-Mile Park Stream Reclamation Phase I 2013 Annual Report
Cherry Creek 12-Mile Park Stream Reclamation Plan
Cherry Creek Stream Reclamation at PJCOS – Modified Design
McMurdo Gulch Reclamation Project 2012 Annual Monitoring Report
McMurdo Gulch Reclamation Project Detention Facility Retrofit Improvements Design
McMurdo Gulch Reclamation Project Stream Reclamation Improvements Design
McMurdo Gulch Reclamation Template
Stream Reclamation, Water Quality Benefit Evaluation – Interim Status Report
Technical Memorandum – Cherry Creek at 12-Mile Park – Phase I
Technical Memorandum – Cherry Creek at 12-Mile Park – Sediment Transport Analysis
Technical Memorandum – Final Recommended Stream Reclamation Plan
Cherry Creek Improvements at the Cherry Creek Ecological Park MEC #09-031.01
Technical Reports
Destratification Reports
2009 Destratification System Annual Report
2010 Destratification System Annual Report
2011 Destratification System Annual Report
2012 Destratification System Annual Report
2013 Destratification System Annual Report
2014 Destratification System Annual Report
2015 Destratification System Annual Report
2016 Destratification System Annual Report
2017 Destratification System Annual Report
2018 Destratification System Annual Report
2019 Destratification System Annual Report
2020 Destratification System Annual Report
Feasibility Report Cherry Creek Reservoir Destratification
Conceptual Investigation of Reservoir Destratification for Cherry Creek Reservoir
Aeration Compressor Evaluation
Evaluation of In-Reservoir Treatment at Cherry Creek Reservoir
Water Quality
CCBWQA Water Quality Perception Survey
CDOT Water Quality Report by MEC
CDOT-Arapahoe Road over Cherry Creek – Water Quality Report
EPA Wetlands & Water Quality Trading – CCBWQA as Case Study- Pt 1
EPA Wetlands & Water Quality Trading – CCBQWA as Case Study – Pt 2
Water Quality Issue Associated with relocation of Stable Concession
Reservoir
Preliminary Report Limnocorral Study of Cherry Creek Reservoir
Cherry Creek Reservoir Area-Capacity Data w/ Additional Topo
Cherry Creek Reservoir Area-Capacity Data, Amended
Cherry Creek Reservoir Model and Proposed Chlorophyll Standard
Cherry Creek Reservoir Water Quality Model Documentation – Hydros
Cherry Creek Reservoir Water Quality Model Documentation Attachments – Hydros
Relationship Between Ground Water in the Cherry Creek Alluvium and Cherry Creek Reservoir
Review and Analysis of Hydrologic Information on Cherry Creek Watershed and Cherry Creek Reservoir
Studies of Phytoplankton Response to Nutrient Enrichment in Cherry Creek Reservoir, Colorado
West Boat Ramp Parking Lot Improvements – Water Quality Analysis
West Shoreline Erosion Control Management
West Shade Shoreline Stabilization
West Shade Shelter Shoreline Stabilization PRF – Water Quality Analysis
Phosphorus Reports
AMEC 2007 Phosphorus Facilitator Report
Cherry Creek Basin Watershed Phosphorus Model Documentation
Depth Profile Study of Phosphorus Concentrations in the Cherry Creek Alluvial Aquifer
Evaluation of Phosphorus – Phase I
Phosphorus Credit Pricing Considerations for Cherry Creek Basin
West Cherry Creek Background Phosphorus Report Project No. 5862
Other Technical Reports
CCBWQA Watershed Model – Reservoir Direct Flow Areas
Cherry Creek ERP Criteria 2002
Cherry Creek Sediment Analysis Technical Memoranda
Cherry Creek Watershed Smart Growth for Clean Water Report
Control Regulation 5 CCR 1002-72 Stormwater Permit Requirements Guidance Document
Cherry Creek State Park Wetlands Feasibility Memo
Evaluation of Nonpoint Source Pollution Risks
Evaluation of Phosphrous – Phase II
Final Report prepared by William Lewis
NMMA 2012 Recreational Boating Economic Study
Preliminary Evaluation of Recreational Value Provided by Cherry Creek State Park
Other Technical Reports (cont.)
Preliminary Report Limnocorral Study of Cherry Creek Reservoir
Stewardship and Education Initiative
Summary of Activities to Comply with Phased TMAL Requirement
Updated Analysis of “Bow Tie” Property
USACE HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam
Volume 3 Cost of Nonpoint Control Options
Voluntary Lead Management Report Cherry Creek State Park, Family Shooting Center
CCBWQA 2016 Final Report by BBC on Review Analysis of Rates, Fees, Taxes and Finance Structure