Skip to main content

Other Technical Reports

Analysis of the Prediction of Total Runoff and Runoff Sources by the Cherry Creek Basin Authority Model 
CCBWQA Watershed Model – Reservoir Direct Flow Areas 
Cherry Creek ERP Criteria 2002 
Cherry Creek Sediment Analysis Technical Memoranda 
Cherry Creek Watershed Smart Growth for Clean Water Report 
Control Regulation 5 CCR 1002-72 Stormwater Permit Requirements Guidance Document 
Cherry Creek State Park Wetlands Feasibility Memo 
DRCOG – Technical Report 
DRCOG Clean Lakes Study 
Evaluation of Nonpoint Source Pollution Risks 
Evaluation of Phosphrous – Phase II 
Final Report prepared by William Lewis 
NMMA 2012 Recreational Boating Economic Study 
Preliminary Evaluation of Recreational Value Provided by Cherry Creek State Park 
Preliminary Report Limnocorral Study of Cherry Creek Reservoir 
Stewardship and Education Initiative 
Summary of Activities to Comply with Phased TMAL Requirement 
Surface Water Hydrology 
Technical Memo No. 6 
Technical Memorandum – An Analysis of Potential Mechanisms Contributing to Nuisance Algal Blooms in Cherry Creek Reservoir 
Updated Analysis of “Bow Tie” Property 
USACE HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam 
Volume 3 Cost of Nonpoint Control Options 
Voluntary Lead Management Report Cherry Creek State Park, Family Shooting Center 
CCBWQA 2016 Final Report by BBC on Review Analysis of Rates, Fees, Taxes and Finance Structure 
BBC Browne Bortz and Coddington Financial Analysis 1-8-1999